C&S No. 1113

No. 1113

C&S No. 1113 now is in stall # 5 for the long term. Here is a picture of it prepped to receive new side sills to both sides. The structural members of both sides are being treated with Abatron and will be reused along with the interior siding. The exterior siding and floor will be replaced with new lumber along with the roof.

Telegrapher
Donate
Volunteer